Antora Energy — Startup Profile
The thermal-battery company storing renewable power in glowing-hot carbon blocks to run industry and data centers around the clock
HQ: San Jose, CA, USA (North San Jose Zanker Road manufacturing campus; Sunnyvale registered address and office; earlier HQ in Sunnyvale) | Founded: 2018 | Employees: ~270–310 (LinkedIn ~272; PitchBook ~277; Revelio Labs ~308 as of March 2026) | Stage: Series C (Private) | Website: https://antoraenergy.com (301-redirects to https://antora.com)
About
Antora Energy builds factory-made thermal batteries that store low-cost renewable electricity as heat in insulated blocks of solid carbon, then deliver that energy around the clock as industrial process heat or firm electricity. The company was founded in 2018 by Andrew Ponec (CEO, previously founded Dragonfly Systems, acquired by SunPower in 2014), Justin Briggs (COO, Stanford applied physics PhD), and David Bierman (CCO, MIT mechanical engineering PhD, founder of Marigold Power), who merged their efforts after meeting through the Cyclotron Road incubator and the Activate Fellowship.
Technically, the system resistively heats carbon blocks — earth-abundant, with no thermal-runaway risk — to temperatures up to 2,400°C, far above molten-salt systems. Heat discharges directly to industrial processes; electricity is generated today via off-the-shelf steam turbines paired with the storage, with Antora's in-house thermophotovoltaic (TPV) cells (>40% efficiency demonstrated, world's first dedicated TPV line) positioned as a future conversion product. Batteries are made at the expanded San Jose, California gigafactory.
The commercial milestone is Project Big Stone: a 5 GWh, 50 MW system commissioned in May 2026 at POET's plant in Big Stone City, South Dakota — over 200 batteries, empty lot to energy delivery in under 12 months, among the largest battery storage projects in the world, under a long-term heat offtake with zero offtaker capex. Antora has raised roughly $770M in equity since inception, including a $550M Series C in July 2026 co-led by G2 Venture Partners and Eclipse, plus ARPA-E and DOE awards. The company employs roughly 270–310 people and is establishing a second U.S. manufacturing hub while pursuing signed (unnamed) hyperscaler data-center agreements.
The Take
Antora's bet is that the cheapest path to round-the-clock industrial energy is not better lithium batteries or green hydrogen, but heat itself: charge insulated blocks of solid carbon with the cheapest hours of wind and solar, store the energy at up to 2,400°C, and discharge it as industrial heat or firm electricity. Carbon is abundant (the company notes it is the fourth-most-produced industrial material on Earth), roughly a tenth the cost of lithium-ion battery materials, free of critical-mineral supply risk, and stable for 20+ years without cycling degradation — a deliberately unsexy materials choice that lets Antora manufacture road-shippable modules on ordinary supply chains.
The company proved the concept with a commercial-scale system at Wellhead Electric near Fresno in September 2023, opened its San Jose factory a month later, raised a $150M Series B led by Decarbonization Partners (BlackRock/Temasek) in February 2024, and delivered its proof point in May 2026: Project Big Stone, a 5 GWh, 50 MW multi-day thermal battery at POET's ethanol plant in Big Stone City, South Dakota — over 200 modules, empty lot to energy delivery in under 12 months, among the largest battery storage systems in the world, under a long-term heat offtake with zero offtaker capex.
That deployment also marks the strategic pivot. Antora now sells firm power to data centers and the grid as aggressively as industrial heat; its $550M Series C (July 2026, co-led by G2 Venture Partners and Eclipse) cites signed hyperscaler agreements — though names, binding status, capacity and timing are undisclosed. Commercial power today flows through off-the-shelf steam turbines; the higher-efficiency TPV heat-to-power path remains a future product. The open questions are executional: whether steam-turbine economics win data-center deals against lithium-ion, whether tariff structures like Otter Tail Power's replicate, and whether the undisclosed pipeline converts into steel in the ground.
Key Metrics
- Founded: 2018, by Stanford alumni Andrew Ponec and Justin Briggs with MIT PhD David Bierman; team merged through the Cyclotron Road (LBNL) / Activate Fellowship program
- Founders & CEO: Andrew Ponec (CEO, ex-Dragonfly Systems, acquired by SunPower 2014); Justin Briggs (COO, Stanford applied physics PhD); David Bierman (CCO, MIT mechanical engineering PhD, founder of Marigold Power)
- Headquarters: San Jose, California (expanded Zanker Road campus ~101,000 sq ft across three buildings, April 2026); Sunnyvale registered address; note: some older datasets still list Sunnyvale HQ
- Employees: ~270–310 (LinkedIn ~272, +34% YoY; Revelio Labs ~308 as of March 2026, up from ~79 in mid-2023)
- Total funding: ~$770M in equity since inception (Crunchbase, July 2026); company cites ~$1B in total corporate and project financing (Canary Media); Tracxn reports $822M across 12 rounds
- Series C: $550M closed July 30, 2026, co-led by G2 Venture Partners and Eclipse; oversubscribed; valuation not disclosed
- Flagship deployment: Project Big Stone — 5 GWh / 50 MW thermal battery at POET's Big Stone City, SD bioprocessing plant; 200+ modules; commissioned May 19, 2026; fully operational later in 2026; long-term heat offtake, zero offtaker capex
- Technology envelope: Solid carbon blocks stored at up to 2,400°C; heat delivery products up to 375°C at customer interface today; power via steam turbine power blocks (50 MW_e nameplate); TPV heat-to-power (>40% efficiency demonstrated) positioned as future product
- Non-dilutive support: ARPA-E DAYS award (~$8M, 2019); ARPA-E SCALEUP up to $14.5M (June 2024, partnering with Con Edison; Shell LOI); part of DOE OCED-selected team (Summit Materials-led cement consortium) for up to $215.6M (March 2024); earlier NSF, CEC and Activate support
Funding Rounds
- Round: Undisclosed (2019–2021) — Fifty Years VC (earliest named institutional backer); government grants of ~$5M+ reported by 2020 (ARPA-E DAYS ~$8M in 2019 per ARPA-E; NSF, California Energy Commission, Activate Fellowship)
- Round: More than $50M (2022-02-16) — Breakthrough Energy Ventures and Lowercarbon Capital (co-leads)
- Round: $150M (2024-02-22) — Decarbonization Partners (BlackRock/Temasek joint venture)
- Round: ~$71.7M reported sold (offering target $76.7M) (2025-11) — Undisclosed (Form D lists 26 investors)
- Round: $550M (oversubscribed; Form D filed August 4, 2026 reported $457.6M sold against the $550M target at filing date, indicating tranching) (2026-07-30) — G2 Venture Partners and Eclipse (co-leads)
Key People
- Andrew Ponec
- Justin Briggs, Ph.D.
- David Bierman, Ph.D.
- Jordan Kearns
- Jerome Pereira
- Jason Evans
- Ty Jagerson
- Mathew O'Sullivan
Key Competitors
- Rondo Energy —
- Electrified Thermal Solutions (ETS) —
- Form Energy —
- 1414 Degrees —
- Fourth Power —
- Incumbent alternatives: gas boilers/turbines, green hydrogen, molten salt, electric resistance —
Timeline Highlights
- 2026-09-10: GrafTech carbon supply MOU
- 2026-07-30: $550M Series C closed
- 2026-05-19: Project Big Stone commissioned
- 2026-04: San Jose campus expansion completed
- 2025-11-03: Form D filing (~$71.7M sold)
- 2025-07: POET / Otter Tail Power project revealed
- 2024-06-25: ARPA-E SCALEUP: up to $14.5M
- 2024-03: Selected for DOE OCED team award (up to $215.6M)
- 2024-02-22: $150M Series B
- 2023-10-24: San Jose manufacturing facility announced
- 2023-09-12: First commercial-scale system launches at Wellhead Electric
- 2022-12-21: Acquires Medley Thermal
- 2022-02-16: $50M+ Series A
- 2019: ARPA-E DAYS award
- 2018: Antora founded
Recent News
- Antora closes $550M Series C to meet surging energy demand and reindustrialize America (2026-07-30)
- Antora and POET commission 5 GWh thermal battery project in South Dakota (2026-05-19)
- Thermal battery maker Antora expands San Jose footprint and hiring (2026-04-02)
- GrafTech and Antora Energy sign MOU for carbon thermal battery supply (2026-09-10)
Similar Startups
- Form Energy — Iron-air batteries for multi-day energy storage
- Helion Energy — Commercial fusion power using field-reversed configuration technology
- Commonwealth Fusion Systems — The MIT-spinoff building SPARC, a commercial net-energy fusion power plant
- Fervo Energy — Next-generation geothermal power using horizontal drilling and fiber optic sensing
- Charm — We make the command line glamorous — the team behind Bubble Tea, Lip Gloss, Glow and the Crush AI co
Browse: Home | Blog | About | All Startups A-Z | View full profile on StartupWiki